UbotBuild · Construction tools

Drawings – Quantities – Estimates connected with ERPCons

UbotBuild reads drawings, takes off quantities automatically, applies material unit prices and pushes data straight to projects, contracts and costs on ERPCons – no re-entry, no discrepancies.

  • Import PDF/DWG/IFC drawings
  • Automatic quantity take-off
  • Connect supplier material unit prices
  • Push data to projects, contracts and costs
UbotBuild· Floor 1 – Structural plan.dwg98% taken off
24.000 Rm 101 – 36.2 m² Lobby – 28.4 m²
Quantity
C30 column concrete18.6 m³
D16 rebar2.34 tons
Beam formwork142 m²
220 wall masonry86.5 m²
Wall plastering312 m²
Estimate2.46B
PDFDWGIFC Push to ERPCons
Estimate preparation time
-60%

From drawing to estimate in one flow

01

Import drawings

Supports PDF, DWG, IFC (BIM). Version management and comparison of changes between releases.

02

Automatic quantity take-off

Identifies components and calculates area, volume and length by work item and floor.

03

Connect material unit prices

Applies unit prices from suppliers, norms and internal price lists to produce the estimate.

04

Push to ERPCons

Creates project budgets, contract appendices, cost plans and material requirements.

UbotBuild → ERPCons data flow

A single quantity source from design through to final settlement.

01
Drawings
PDF / DWG / IFC
02
Quantity
Auto take-off
03
Unit price
Suppliers, norms
04
Estimate
By work item
05
ERPCons
Projects · Contracts · Costs
06
Case Study
Comparison & alerts

How is data synced?

UbotBuild dataTo ERPConsUsed for
Estimate by work itemProject – budgetBudget control, overrun alerts
Bill of quantities (BOQ)Contracts – addendaContract signing, variation tracking
Quantities by phaseOutput – acceptanceStaged acceptance and payment
Material requestsProcurement – warehousePurchase planning, quote comparison
Unit prices & normsCost – financeEstimate vs. actual comparison

When drawings change, everything updates

Release a new drawing and UbotBuild compares it, shows quantity increases/decreases, and proposes contract variations automatically.

  • Compare quantities across drawing versions
  • Propose variation addenda with supporting basis
  • Change history stored in Records & CDE
Uncontrolled contract variations

Value delivered

Fewer take-off errors
Shorter estimating time
Control materials against the design
No data re-entry
Estimate vs. actual comparison
Design–construction coordination